Last edited by JoJogis
Friday, May 8, 2020 | History

1 edition of Spencer Creek Bridge US Highway 101 final environmental impact statement and final section 4(f)/6(f) evaluation. found in the catalog.

Spencer Creek Bridge US Highway 101 final environmental impact statement and final section 4(f)/6(f) evaluation.

Spencer Creek Bridge US Highway 101 final environmental impact statement and final section 4(f)/6(f) evaluation.

  • 316 Want to read
  • 30 Currently reading

Published by Oregon Dept. of Transportation, Region 2, Area 4, Federal Highway Administration in Corvallis, OR, Salem, Or .
Written in English

    Subjects:
  • Bridges -- Maintenance and repair -- Environmental aspects -- Oregon -- Lincoln County.,
  • Environmental impact analysis -- Oregon -- Lincoln County.,
  • Spencer Creek Bridge (Or.) -- Maintenance and repair.

  • Edition Notes

    Other titlesSpencer Creek Bridge Project US 101, Lincoln County, Oregon, key no. 10058.
    ContributionsOregon. Dept. of Transportation., United States. Federal Highway Administration.
    The Physical Object
    Pagination1 v. (various pagings) :
    ID Numbers
    Open LibraryOL17727273M

    Environmental documentation for the SR , to Medina: Bridge Replacement and HOV Project includes the Final Environmental Impact Statement (June ) and supporting discipline reports, the Record ofDecision (August ), SEPA Addenda (October and November ), NEPA Environmental Reevaluations (December , January , July. SRF led a team of 10 subconsultants for the complete reconstruction of the roadway approaches to I (which spans the Mississippi River), three miles of retaining walls, and seven inland bridges (four of which are complex steel curved bridges) as part of the overall interchange design. The team for this highly complex project provided final [ ].

    alemany project follow up work us overnight lane and full highway closures Published: Free Shuttle Service to Accommodate Cyclists and Pedestrians During Posey Tube SR Final National Mall Plan/Environmental Impact Statement, National Mall and Memorial Parks Washington, D.C. () (pdf) Lafayette Park: Historical Research Series Number 1 () (pdf) Legislative History of National Capitol Parks and Descriptions of the Seventeen Original Reservations (pdf) Lincoln Memorial: Cultural Landscape Report.

    South Park Bridge project, Seattle: environmental impact statement. Availability: Find a library where document is available. Dapp,Fapp only available on CD-ROM. Corporate Authors: United States Federal Highway Administration, Publication Date: ; Language. English; Subject/Index Terms. TRT Terms: Environmental impact statements. exactly 60 years ago, at the very beginning of the Interstate Highway System, the Aug Policy and Procedure Memorandum required: “Designs for all .


Share this book
You might also like
Training requirements in fisheries and aquaculture in Southeast Asia

Training requirements in fisheries and aquaculture in Southeast Asia

Rain Forest Blank Journal

Rain Forest Blank Journal

Direct response graphics

Direct response graphics

How to form your friends of the library group

How to form your friends of the library group

Souvenir

Souvenir

Encyclopedia of Sports

Encyclopedia of Sports

genius

genius

Frank K. Logan and Dr. F. B. Cogswell communication from the President of the United States transmitting two communications from the Comptroller General of the United States, submitting estimates of appropriations in the sum of $78.85, to pay claims for damages or losses of privately owned property.

Frank K. Logan and Dr. F. B. Cogswell communication from the President of the United States transmitting two communications from the Comptroller General of the United States, submitting estimates of appropriations in the sum of $78.85, to pay claims for damages or losses of privately owned property.

Proceedings of the first American Conference on Human Vibration, June 5-7, 2006, Waterfront Place Hotel, Morgantown, West Virginia, U.S.A.

Proceedings of the first American Conference on Human Vibration, June 5-7, 2006, Waterfront Place Hotel, Morgantown, West Virginia, U.S.A.

Consecrated life today

Consecrated life today

Integrierte Pflanzenproduktion Bericht Zum Schwerpunktprogramm Entwicklung Eines

Integrierte Pflanzenproduktion Bericht Zum Schwerpunktprogramm Entwicklung Eines

Dissertations on the following subjects

Dissertations on the following subjects

Occupational therapy services

Occupational therapy services

Spencer Creek Bridge US Highway 101 final environmental impact statement and final section 4(f)/6(f) evaluation Download PDF EPUB FB2

S HIGHWAY 14 FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) NEW ULM TO NORTH MANKATO, MINNESOTA. Su mmary. Wh at is the US 14 Final EIS. An Environmental Impact Statement (EIS) is a document used to describe the anticipated effects of major public projects.

Since the highway on both ends of the bridge will be four lanes, not expanding. Lost Pratt through truss bridge over Redwood Creek on US HIGHWAY Replaced by new bridge. Reinhart Creek Bridge (Curry County, Oregon) Built Warren deck truss bridge over Rinehart Creek on US Arch bridge over Spencer Creek on US Open to traffic.

Tahkenitch Creek Bridge (Douglas County, Oregon) Built SR is a critical component of the regional infrastructure, connecting Seattle to communities on the Eastside. The SRI-5 to Medina: Bridge Replacement and HOV Project includes several safety, mobility and environmental improvements to help create safer and more reliable commutes while minimizing impacts to local neighborhoods and communities.

On June 9,the Federal Highway Administration (FHWA) approved the Final Environmental Impact Statement (FEIS) for a US freeway in Berrien County, Michigan. The FEIS was prepared by the Michigan Department of Transportation (MDOT) for the relocation of miles of primarily two lane existing US highway between Matthew Road.

This Final Environmental Impact Statement (FEIS) has been prepared in compliance with the National Environmental Policy Act (NEPA) federal regulations on procedures for preparing environmental documents, Section 4(f) of the U.S. Department of Transportation (DOT) Act. This document supports Volume 1 (Main Report) of the Forth Replacement Crossing Environmental Statement.

1 Introduction A Environmental Assessment Team. 4 The Proposed Scheme A Construction Information. 5 Overview of Assessment Process A Supplementary Do-Minimum Assessment. 6 Consultation and Scoping A List of Consultees A () Environmental Impact Statement (EIS) (X) Environmental Assessment (EA) () Categorical Exclusion (CE) () Programmatic CE.

Project Description (use attachment if necessary) The Project consists of the widening of 84 from Hwy to just east of Hair Creek Bridge in LaSalle US Parish, LA. Doyle Drive (South Access to the Golden Gate Bridge) Final Environmental Impact Statement/Report and Final Section 4(F) Evaluation. Volumes 1, 2 & 3 [San Francisco County Transit Authority] on *FREE* shipping on qualifying offers.

Notice of Availability: Final Environmental Impact Statement (Final EIS) Harbor Bridge, Nueces County, Texas Pursuant to Texas Administrative Code, Ti §, the Texas Department of Transportation (TxDOT) is advising the public of the availability of the Final EIS for the proposed construction of theFile Size: KB.

US §¨¦ INTERSTATE CA LIF OR NI Figure 1 Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway P a t h: K: \ P r o j e c t s _ 1 \ J o i n t P o w e r s A u t h o r i t y \ 0 0 7 1 2 _ 1 2 _ U p p e r _ S F _ C r e e k \ m a p d o c \ F i g _ 1 File Size: 1MB.

requirements, 4) each remains eligible for Federal Highway funding, and 5) Kane County, as project sponsor, may advance each through the project development process. Bolz Road Corridor The proposed Bolz Road is an east-west four-lane arterial roadway with median, approximately File Size: KB.

Facts Overview Concrete arch bridge over Cape Creek on US Location Lane County, Oregon Status Open to traffic History Built Builders - Arthur Jordan (Construction Supervisor) - Clackamas Construction Co. of Clackamas, Oregon (Contractor) - Conde B.

McCullough of Redfield, South Dakota (Bridge Engineer) - John K. Holt (Contractor) Design The Cape Creek Bridge is an. West Lake Corridor Final Environmental Impact Statement/ Record of Decision and Section 4(f) Evaluation Chapter 1 Purpose and Need March Project Description The Project is an approximately 9-mile southern single track extension of the existing NICTD SSL between the town of Dyer and city of Hammond, Indiana.

Summary of Environmental Documents. express lanes by low-income populations of the United States Highway (US ) Express Lane Project (Project) in both directions between East Dunne Avenue in Morgan Hill and approximately the IS/EA and Section of File Size: KB.

Green Valley Road at Tennessee Creek Final IS 10/2/ 1 1. INTRODUCTION The El Dorado County Department of Transportation (DOT) proposes to replace Green Valley Road Bridge (25C) at Tennessee Creek with a larger, wider bridge. Bridge 25C is a narrow two-lane bridge that was constructed in To remedy this, the Federal Highway Administration (FHWA), in cooperation with affected state and federal agencies,1 proposes to bypass Hoover Dam with a new bridge crossing of the Colorado River.

This Environmental Impact Statement (EIS) describes the baseline conditions, anticipated impacts, and recommended mitigation. West Lake Corridor Final Environmental Impact Statement/ Record of Decision and Section 4(f) Evaluation Executive Summary March S-3 The Draft Environmental Impact Statement (DEIS) was made available on Decemand circulated for review until February 3,to interested parties including members of theFile Size: 2MB.

Inthe final phase (Tier III) of the feasibility study was initiated. This phase was completed inresulting in the selection of a preferred alternative through a Draft Environmental Impact Statement. Ina Bridge Type, Size, and Location Study (TS&L) began. IDENTIFYING BRIDGE MAINTENANCE.

AND PRESERVATION ACTIONS. WHICH MINIMIZE ENVIRONMENTAL IMPACT. FINAL REPORT. Prepared for: National Cooperative Highway Research Program.

Transportation Research Board. The National Academies of Sciences, Engineering, and Medicine. Prepared by: Greenman-Pedersen, Inc. McVoy Associates, LLC. Albany, New. Initial Study/ Mitigated Negative Declaration. for the. Clear Creek Road at Clear Creek Bridge (25C) Replacement Project.

April Prepared for: El Dorado County. Community Development Agency. Transportation Division. Fairlane Court. Placerville, CA Prepared by: North State Resources, Inc. L Street, Suite. SUMMIT Technical Resources, Inc. Phase I Environmental Site Assessment final_phase_i_esa_ire-evaluation_doc EX-1EXECUTIVE SUMMARY Summit Technical Resources, Inc.

(SUMMIT), conducted a Phase I Environmental Site Assessment (ESA) for the Colorado Department of Transportation (CDOT), Region 2.public that an Environmental Impact Statement (EIS) will be prepared for the proposed project to provide a modern rail crossing at the location of the existing Portageville Bridge (also known as the Portage High Bridge) over the Genesee River in Wyoming and Livingston Counties, New York.September 2, - Northeastern Colorado/CDOT Region 4 - GREELEY– The Colorado Department of Transportation (CDOT) has extended the original day comment period for the North I Final Environmental Impact Statement (FEIS) to 45 days, ending on October 3, in order to give the public and local entities more time to review the comprehensive document.